Kitchen and Bathroom Remodeling in Mountain View, CA: Permits, Inspections and What to Expect
In Mountain View, every bathroom remodel and any kitchen remodel that replaces cabinets needs a city building permit before work starts. Applications go online through ePermitsMV, staff prescreen and review the plans, and the contractor schedules inspections online, ending with a final inspection by a City Building Inspector.

Mountain View has a little of everything: 1920s cottages and bungalows in Old Mountain View, mid-century ranch homes around Cuesta Park and Waverly Park, and the Eichlers of Monta Loma with their post-and-beam ceilings and walls of glass. Many of these kitchens and baths are on their second or third life, and a remodel here often means modern electrical and plumbing work behind the new finishes. The city publishes clear guidance on what needs a permit. Here is the short version.
Do I need a permit to remodel my kitchen in Mountain View?
Usually yes. The city requires a building permit for any kitchen remodel that replaces cabinets, and you need it before construction begins. Replacing countertops or refacing existing cabinets does not need one. Depending on the scope, you may also need electrical or plumbing permits, and replacing a vented range hood needs a mechanical permit. If your plans change the outside of the house, such as a new window or door, the Planning Division has to review them first.
Do you need a permit for a bathroom remodel in Mountain View?
According to the city, all bathroom remodels need a permit, including replacing a tub or shower enclosure. Swapping a standard toilet in the same spot is exempt, as long as the new toilet uses no more than 1.28 gallons per flush.
How does the Mountain View permit process work?
- Prepare plans. The city wants a legible electronic plan with existing and new floor plans. Kitchens also need electrical load calculations.
- Submit online. Building permits are filed electronically through ePermitsMV. The public counter is at City Hall, 500 Castro Street, and virtual counter appointments are offered.
- Prescreen and fees. Staff contact you with the fee and payment instructions, then check the application for completeness. Missing items mean comments and a resubmittal, and each resubmittal starts a new review period.
- Permit issued. When the plans meet code, the permit is issued and work can start.
- Inspections. The contractor books inspections online as work progresses. A final inspection by a City Building Inspector closes the permit.
How long does a Mountain View remodel permit take?
Times depend heavily on scope. Here are the city's published guidelines (check current figures with the city before you plan around them):
| Project type | Plan review (city guideline) | Typical time to permit |
|---|---|---|
| Kitchen, like-for-like replacement | About 3 business days | About 5 business days |
| Kitchen renovation removing walls | About 3 weeks | About 2–3 months |
| Bathroom, fixtures in same location | Comments within 5 business days | About 5–7 days |
| Bathroom with structural changes | Comments within 2 weeks | About 6–8 weeks |
The city's pages also list sample permit fees that include inspections. These are city figures for budgeting your paperwork, not construction quotes.
What do Mountain View inspectors check in a kitchen or bath?
The city's checklists list the code items that most often catch homeowners off guard:
- Kitchens: at least two 20-amp small-appliance circuits for the countertops, AFCI protection on 15–20 amp kitchen circuits, GFCI protection near sinks and for the dishwasher, dedicated circuits for appliances like the microwave and disposal, a dishwasher air gap, and at least 36 inches of clear walkway.
- Bathrooms: an exhaust fan switched separately from the lights (an operable window doesn't count), GFCI protection on all receptacles, safety glass on shower doors, pressure-balanced or thermostatic shower valves, and a non-absorbent shower surround at least 72 inches high.
- Both: high-efficacy lighting and water-conserving fixtures: 1.8 GPM kitchen faucets and showerheads, 1.2 GPM bath faucets, 1.28 GPF toilets. In homes built before 1994, California's SB 407 (Civil Code 1101.1 and following) may also require upgrading older noncompliant fixtures elsewhere in the house; ask the city how it applies to your permit.
For bathroom design ideas, see our bathroom remodel planning guide. If you're comparing nearby cities, read our guides for Palo Alto and Sunnyvale.
What should you know about remodeling an older Mountain View home?
Age shows up behind the walls. Older homes may not have the circuits a modern kitchen needs, and Eichlers have their own quirks, such as slab floors and limited space for new ducting and wiring; our Eichler remodel guide covers them. Plan for discoveries once walls are opened, and leave time for a resubmittal if the design changes. The mild climate makes the work easier. Living without a kitchen for a few weeks is still a test of patience, even with good takeout nearby.
Working with ProRock in Mountain View
ProRock Remodeling is a licensed general contractor (CSLB #1154078) with more than 20 years in business, $1M in general liability insurance, and a 2-year workmanship warranty. We focus on kitchen and bathroom remodels and serve the area from San Jose to South San Francisco, including Mountain View. We pull the permits and handle the inspections, so you don't have to deal with the city yourself. Browse finished kitchens and baths in our project gallery. You can verify any contractor's license, then request an estimate or call (408) 991-4744.
Frequently asked questions
Do I need a permit to replace kitchen countertops in Mountain View?
No. Mountain View does not require a building permit to replace kitchen countertops or reface existing cabinets. If you replace the cabinets themselves, you need a permit before work begins.
Is a permit required to replace a toilet in Mountain View?
Not if you are replacing a standard toilet in the same location. The new toilet must use no more than 1.28 gallons per flush. Other bathroom remodel work, including replacing a tub or shower enclosure, requires a permit.
How do I apply for a remodel permit in Mountain View?
Building permits are submitted online through the city's ePermitsMV portal. Staff prescreen the application, send fee and payment details, and review the plans. The public counter is at City Hall, 500 Castro Street, and the city also offers virtual counter appointments.
Who schedules inspections for a Mountain View remodel?
Per the city's guidance, the contractor schedules inspections online as the work progresses. A City Building Inspector performs a final inspection, and then the permit is finaled.
How long does a Mountain View kitchen or bath permit take?
Simple like-for-like work moves quickly. The city cites about 5 business days to get a kitchen permit and about 5 to 7 days for a bathroom with fixtures in the same place. Projects that remove walls or change structure can take roughly 2 to 3 months for a kitchen and 6 to 8 weeks for a bath. Check current timelines with the city.
Planning a remodel in the Bay Area?
ProRock Remodeling is a licensed general contractor (CSLB #1154078) working from San Jose to South San Francisco, with $1M liability coverage and a 2-year workmanship warranty. Call (408) 991-4744 or request a free estimate.
